WhatsApp

    Trusted by 500+ institutions across India

    Professional ITF Tennis Court Construction Across India

    500+ Courts Delivered  |  4โ€“6 Weeks Completion  |  5-Year Warranty

    500+

    Courts Built

    4โ€“6 Wks

    Completion

    15+

    Years Experience

    Pan India

    Coverage

    What Our Clients Say

    Trusted by schools, academies, clubs and institutions across India

    "Stark Sports delivered our tennis court in just 5 weeks. The acrylic surface quality is outstanding and the line markings are perfectly precise. Our students are thrilled."

    Mr. Rajesh Kumar

    Principal, DPS Faridabad

    "We got 3 tennis courts built for our sports academy. The team was professional, materials were top-grade, and they completed on schedule. Worth every rupee."

    Col. Arun Sharma (Retd.)

    Director, Chandigarh Tennis Academy

    "Our housing society now has a beautiful ITF-standard tennis court. Stark Sports guided us from design to handover. The cushioned surface is excellent for evening play."

    Mr. Vikas Mehta

    RWA President, Gurugram

    Our Trusted Clients

    Partnering with leading organizations across industries

    AIF logo
    AIPL logo
    ELD logo
    FF logo
    Fort logo
    M2K logo
    M3M logo
    Narayan logo
    NP logo
    SG logo
    TDI logo
    Vatika logo
    AIF logo
    AIPL logo
    ELD logo
    FF logo
    Fort logo
    M2K logo
    M3M logo
    Narayan logo
    NP logo
    SG logo
    TDI logo
    Vatika logo

    Serving Across India

    We have completed projects in 50+ cities

    Delhi NCR

    Mumbai

    Bangalore

    Pune

    Hyderabad

    Chennai

    Chandigarh

    Jaipur

    Lucknow

    Ahmedabad

    Kolkata

    Srinagar

    Get My Court Cost in 24 Hours

    ๐Ÿ“… Next site visit slot: Thu, 30 Apr

    Trusted by

    M3MVatikaTDIAIPLM2K

    No spam ยท One callback only ยท Quote in 24 hours

    or chat directly

    WhatsAppWhatsApp Us

    Tennis Court Construction Services

    Stark Sports delivers complete turnkey tennis court projects โ€” from base construction to acrylic surfacing, fencing, and lighting. Every court is built to ITF specifications for long-term performance in Indian weather.

    What We Build

    • Complete turnkey court construction
    • Concrete base preparation & drainage
    • ITF-certified acrylic surface application
    • Professional line marking
    • Perimeter fencing & net installation
    • LED floodlight systems for night play
    • Court repair & resurfacing

    Surface Options

    • ITF-Certified Acrylic Hard Court

      Most popular โ€” durable, fast, low maintenance

    • Cushioned Acrylic Systems

      Joint-friendly; ideal for schools & academies

    • PP Interlocking Tiles

      Quick install, no base required

    • Synthetic Grass Courts

      Low bounce, comfortable for recreational play

    How We Work โ€” Our Process

    From first call to court handover in 4โ€“6 weeks

    1

    Site Visit & Assessment

    Our technical team visits your location to assess ground conditions, measure dimensions, check drainage, and understand your requirements. We provide a detailed quotation within 24โ€“48 hours.

    2

    Ground Preparation (Week 1)

    Excavation, leveling, and compaction of the base. We ensure proper slope (1:100) for water drainage. Stone aggregate base is laid and compacted using rollers.

    3

    Base Construction (Week 2โ€“3)

    Concrete or asphalt base is laid as per specifications. This forms the foundation and must cure properly before surface application. Perimeter fencing structure is installed.

    4

    Surface Application (Week 4โ€“5)

    Multiple layers of acrylic surface are applied. Each layer is allowed to cure before the next application. Professional line marking is done using laser-guided equipment.

    5

    Finishing & Handover (Week 6)

    Net posts and nets are installed. Lighting system if included. Final quality checks and court testing. Complete handover with warranty documentation.

    Understanding Surface Layers

    A professional tennis court is built in multiple layers โ€” each serving a specific purpose for durability, performance, and player safety.

    Layer 1: Sub-Base (150โ€“200mm)

    Compacted soil and stone aggregate. Provides stable foundation and manages water drainage away from the court surface.

    Layer 2: Base Layer (75โ€“100mm)

    Concrete (M20 grade) or asphalt base. This is the structural foundation that determines court flatness and long-term stability.

    Layer 3: Primer / Binder Coat (1โ€“2 coats)

    Acrylic binder that seals the concrete/asphalt and provides adhesion for upper layers. Fills minor surface imperfections.

    Layer 4: Resurfacer / Leveling Coat (2โ€“3 coats)

    Acrylic resurfacer with fine aggregates. Creates a smooth, uniform surface and repairs any remaining imperfections.

    Layer 5: Cushion Layer (Optional โ€” 1โ€“2 coats)

    Rubber-modified acrylic for cushioned systems. Reduces impact on joints and provides better player comfort. Recommended for professional facilities.

    Layer 6: Texture / Play Coat (2โ€“3 coats)

    Color-coated acrylic with silica sand. Determines court speed (fast, medium, slow) and provides the playing surface โ€” usually applied in green or blue.

    Layer 7: Line Paint & Top Coat (1โ€“2 coats)

    Professional line marking in white. Final seal coat for UV protection and color retention. Lines are laser-marked for ITF accuracy.

    Total Surface Thickness: Standard courts have 3โ€“5mm surface thickness (hard court) while cushioned systems have 6โ€“8mm. Total construction depth including base is approximately 250โ€“300mm from finished level.

    Why Choose Stark Sports

    500+ tennis courts delivered across India
    ITF-certified materials meeting international standards
    15+ years of specialized experience
    Pan-India service with local site teams
    5-year warranty on construction
    Fast 4โ€“6 weeks completion guaranteed
    Free site visit and detailed quotation
    Dedicated project manager for every job

    Frequently Asked Questions

    Everything you need to know before building your tennis court

    We use ITF-certified acrylic surfaces that are standard for professional tennis. This provides excellent ball bounce, durability, and is suitable for Indian weather. We also offer PP tiles and synthetic grass options based on your requirements.
    Typically 4โ€“6 weeks from start to finish for a standard court. Timeline depends on site conditions and weather. We provide a detailed schedule during consultation and stick to it.
    Starting from โ‚น35/sq ft for standard acrylic surface. A standard court (120'ร—60') costs โ‚น2.5โ€“4 Lakh depending on surface type and specifications. We provide a detailed quotation after the site visit.
    Yes, we work pan-India. We've completed 500+ projects across Delhi NCR, Mumbai, Bangalore, Pune, Hyderabad, Chennai, and many more cities. Same quality and service everywhere.
    Yes. We provide crack repair (โ‚น8โ€“12/sq ft), complete resurfacing (โ‚น15โ€“25/sq ft), and court repainting. This typically costs 30โ€“40% of new construction.
    We provide a 5-year warranty on construction quality and surface. Our team is available for ongoing support. We've been in business for 15+ years with 500+ satisfied clients.
    With proper care, our tennis courts last 10โ€“15 years. The acrylic surface is designed to withstand heavy use, UV exposure, and monsoon conditions.
    Yes, we provide professional LED lighting systems designed for tennis courts. Lighting installation costs โ‚น1โ€“3 Lakh and allows evening and night play.

    Ready to Build Your Tennis Court?

    Free site visit ยท Detailed quote in 24 hrs ยท Pan-India service